AI for AEC engineering teams.

For the civil, structural and electrical engineers on a project: Torus drafts calculations and drawings in your firm’s templates, checks them against the code editions you pin to the project, and follows a revised load or layout through every sheet it touches. Your engineers of record approve the work.

Get the demo package

Site and civil

Earthwork, grading and drainage, hydrology and stormwater. Torus checks the grading against the drainage design and stormwater flows by the rational method. The published meter station package includes its hydrology and drainage calculation (CIV-CAL-002) and its grading and drainage plan (CIV-DWG-003).

Foundations and structure

Design loads, foundations and steel, checked for seismic and wind to ASCE 7, footings to ACI 318 and beams to AISC 360, with deflection limits and the load path flagged when they break. See the package’s foundation design (STR-CAL-002) and foundation drawings (STR-DWG-002).

Electrical and fire protection

Load lists, one-line diagrams, voltage drop and conduit fill to the NEC, and sprinkler and hydrant coverage to NFPA 13. A revised equipment load reaches the load list and the one-line that carry it.

A piece of equipment moves

Move a skid or raise its load, and the foundation design, the pipe support schedule and the electrical load list all change. Torus flags every document that still carries the old value and redrafts each for the engineer responsible, so no discipline is handed a new number without the reason for it.

How each discipline works in Torus

Overall site plan from the redacted Torus demo package
From the published meter station package, redacted, issued for review.

What Torus covers today

The engineering disciplines: civil, structural, electrical and fire protection. Torus does not do architectural design, plumbing or building code (IBC) review. The published packages are energy projects, a meter station and a geothermal well pad, and their civil and structural sheets show the drafting.

Pilot a design change

Bring one coordination problem, such as a moved piece of equipment or a revised load, with your drawings, calculations and review criteria. We run it through Torus with your engineers, so you can watch the change reach every affected sheet.