AI for EPC engineering teams.

From the project basis to the issued package: Torus drafts the P&IDs, line list, datasheets and calculations in your client’s templates, checks every value they share, and carries each change through to the next issue. Your engineers approve every sheet.

Get the demo package

From basis of design to package

Torus drafts from the project basis or your 3D model: P&IDs, PFDs, the line list, equipment and instrument datasheets, the load list and the calculations behind them, all from the same values. The published meter station package is 256 documents in 11 volumes, drafted in about 5 hours of engineer time.

The checks your leads would run

Tags across the equipment list, P&IDs and datasheets. The line list against the P&IDs and the piping class, with pressure ratings, flange ratings and wall thickness to ASME B31.3. PSV sizing to API 520, and set pressure against MAWP. The one-line against the load list. Each flag shows the clause it cites and the value in each document.

Vendor data against the purchase spec

Vendor submittals arrive while the design is still moving. Torus checks them against the purchase specification and the datasheet, then flags the P&IDs, line lists and electrical loads that change with them.

A relief load change, carried through

PSV-101’s relief load rises from 15,800 to 24,500 lb/h. The valve datasheet, line list, relief load calculation and vent header sizing are redrafted together, anything that no longer holds is flagged, and the set goes to your engineer. The example is built on the published meter station package, not on a client project.

How each discipline works in Torus

Station inlet P&ID from the redacted Torus demo package
From the published meter station package, redacted, issued for review.

Change requests become change orders

A change request that arrives by email opens a change order listing every document it affects. Each one is redrafted on its own branch and released only after your engineer approves it. An issued document is never edited in place.

Ready for the transmittal

Before a package is issued, its check record lists every comparison and how each finding was resolved, and the hold register lists every open hold with the documents that cite it. The meter station’s check record covers 20,201 comparisons, none open at issue.

Pilot one work package

Send the project basis for one of your packages, with the client’s templates. We draft it as a first package, so you can judge the drafting, the checks and how a revision carries through before a wider rollout.